22nd April 2022. €120m Waste-to-Energy Gasification Plant.
The Royal Court of East Bréifne O’Reilly in partnership with international investors, industry experts, Gasification design companies, and waste-to-energy engineers consult on a proposed €120m Waste-to-energy plant. The proposed plant is expected to be operational in 2025 and can convert approx. 40,000 tonnes of municipal waste per annum, potentially removing 250,000 tonnes of C02 equivalent from the environment. While producing around 3.8 million MBtu of Natural Gas and or 3500 tonnes of Hydrogen for the domestic market which will be sold in Reilly Coin as the currency and method of exchange.